|
I started the build back at the stud and floor joist level. I made the towel, paper, and mirror fixtures which are stainless steel.
I did all the work including the SwanStone solid surface counter tops and tub surround. I did all the cabinet work in Maple. The floor is 12 in. porcelain title.
The mirror is mounted out from the wall about 2 inches with a night light behind it.
|   |